English

English

Products

Hybrid Air-Liquid Cooling Simulated Load Bank

1.No real GPU needed for rack acceptance test 2.Avoid expensive GPU wear & tear during commissioning 3.Full rack thermal & power verification for GB200/GB300 NVL72
inquiry now
details

Simulate GB200 / GB300 NVL72 Rack Load Without Real GPU | Data Center Pre-Acceptance Test
【Core Benefits]

✅No real GPU needed for rack acceptance test

✅Avoid expensive GPU wear & tear during commissioning

✅Full rack thermal & power verification for GB200/GB300 NVL72

【Core Features】
✅ 1:1 Replica for GB200 / GB300 | Simulate real GPU heat flux & power load, no real GPU hardware required
✅ Hybrid Air+Liquid Independent Control | Separate adjustment for air cooling zone and liquid cooling zone, verify full thermal design
✅ Full-scene Automated Acceptance Test | Auto generate formal test report for data center project pre-acceptanceimg-mv6g3yhx-aa97f47e(1).png                                 Click Here to Start Contacting Us


【Quick Selection Guide】
✅
Power standard: 3-phase, 415V Line / 230V Phase; Custom 480V(277V phase) available
✅GB200 NVL72 Rack → VILVA-AC415V-208kW-J
✅GB300 NVL72 Complete Rack → VILVA-AC415V-250kW-G3
✅Half Rack / Small Node Test → 120kW /130kW Compact Model
✅Custom 480V Ultra High Density Rack → Customized 300kW Solution

【Hot Questions】

Q1: Can this load bank simulate GB200 / GB300 rack heat flux 1:1?

A1: Yes. It can reproduce the exact power consumption and heat flux of GB200 / GB300 NVL72 GPUs 1:1, matching the real rack thermal profile for pre-acceptance testing without physical GPUs.

Q2: Does it support AC415V Line / 230V Phase three-phase power system?

A2: Yes, it supports 415V Line / 230V Phase 3-phase power. 400V/230V version and 480V(277V phase) customized option are also available.

Q3: Can multiple load banks be paralleled for multi-rack cluster testing?

A3: Yes. Multiple units can be synchronized and paralleled to simulate multi-rack GPU cluster load for large-scale data center verification.

Q4: Can it auto generate acceptance test report for data center project?

A4: Yes. The system automatically records test data and exports editable acceptance test reports (CSV/PDF) for data center project handover.

Q5: Is on-site commissioning service available overseas?

A5: Yes. We provide overseas on-site commissioning, training and technical support; remote online commissioning is also available as an alternative.


Q6: What is the step resolution of load adjustment?

A6: Standard load step resolution is 1kW. Custom finer step resolution can be configured upon request.

Q7: Does it support remote control via MODBUS / TCP/IP?

A7: Yes, MODBUS-RTU and MODBUS TCP/IP are built-in. It supports remote load setting, real-time data reading and alarm monitoring.

Q8: What is the cooling method of this rack load bank? Air cooling or liquid cooling?

A8: Air cooling is standard. Liquid cooling version is available for high heat density GB300 rack simulation on request.

Q9: What is the maximum continuous operating time at full load?

A9: It supports 24/7 continuous stable operation under rated full load.

Q10: Can it simulate dynamic load fluctuation for power failure & UPS switching test?

A10: Yes. It supports programmable dynamic load profiles, step/ramp load changes to simulate power outage and UPS transfer switching tests.

Q11: What protection functions are built-in (overheat, overcurrent, overvoltage, emergency stop)?

A11: Built-in protections include over-temperature, over-current, over-voltage, under-voltage, fan failure and emergency stop. It will automatically cut off load once alarm triggers.

Q12: What is the delivery lead time for standard & customized models?

A12: Standard models: 4–6 weeks. Customized liquid cooling / special voltage models: 8–12 weeks, subject to project specification.

Q13: Can the heat distribution match the actual GPU layout inside the rack?

A13: Yes. We design the internal heat distribution and air outlet layout to replicate the thermal distribution of real GPU arrangement inside the rack.

Q14: What data parameters can be recorded during the test?

A14: It records voltage, current, active power, apparent power, power factor, temperature, operating time and alarm logs.



1791958585693640.png

Send a Message

If you have any questions or suggestions, please write down your questions or suggestions, we will answer your questions as soon as possible!

Submit
Hot Products
related products
AC400V 1000KW Resistive Load Bank For Generator Testing
AC400V 1000KW Resistive Load Bank For Generator Testing
Type: container outdoor type Product name: AC400V- 1000KW Resistive Load Bank Brand: Vilva (can OEM brand) Appication: Generator test
200KW AC Resistive Load bank
200KW AC Resistive Load bank
Rated Power: 200KW Rated Voltage: AC220V, Other voltage and frequency are available on demand Working Voltage: AC220V/50Hz
380V 700KW AC Resistive Load bank 50HZ with High Precision
380V 700KW AC Resistive Load bank 50HZ with High Precision
Rated Power: 700KW Rated Voltage: AC380V, Other voltage and frequency are available on demand Working Voltage: AC380V/50Hz Control mode: Local manual with touch...
AC Liquid Cooled Resistive Load Bank Tester for Data Center Testing
AC Liquid Cooled Resistive Load Bank Tester for Data Center Testing
Functions:GB200 dummy load` / `GB300 simulated load bank Load Accuracy:-5%~+2% Control Methods:Touch Screen Control, Remote Control, APP Display Accuracy:0.5% Protection Functions:Overvoltage/Water Temperature Detection/etc
30KW AC Resistive Load bank
30KW AC Resistive Load bank
Rated Power: 50KW Rated Voltage: AC220V, Other voltage and frequency are available on demand Working Voltage: AC220V/50Hz
150KW AC Resistive Load bank
150KW AC Resistive Load bank
Rated Power: 150KW Rated Voltage: AC220V, Other voltage and frequency are available on demand Working Voltage: AC220V/50Hz
sign up for newsletter

wants to get latest updates! sign up for free.

submit
welcome !
submit

home

Products

News

contact